ORB provided structural, electrical and plumbing engineering design for concrete cast mold foundation support. The project also included:

  • Site survey to document existing conditions for electrical distribution systems.
  • Design of electrical riser plan for new distribution and panel schedules.
  • Design of plumbing plan for water distribution.
  • Design of structural drawings plans, sections and details.

Location: Bartow, FL

Date

July 29, 2012

Client

Valmont Newmark

Category

DESIGN