ORB provided structural, electrical and plumbing engineering design for concrete cast mold foundation support. The project also included:
- Site survey to document existing conditions for electrical distribution systems.
- Design of electrical riser plan for new distribution and panel schedules.
- Design of plumbing plan for water distribution.
- Design of structural drawings plans, sections and details.